sauna build

My Off-Grid Wood-Fired Sauna in the Mountains

By Colin B. · Leadville, CO · Long cold winters, short cool summers climate

$4,100.00
Total cost
21
Days to build

The Build

No electrical service at this cabin, so a wood-fired heater was the only real option, which honestly ended up being the part of the build I enjoyed most. Chimney installation is the part I'd tell anyone to hire out unless you've done it before — clearances and flashing details matter a lot for fire safety.

Heat-up takes about 45 minutes to an hour depending on wood and outside temperature, longer than electric, but there's a smell and quality of heat from wood that I haven't gotten from any electric unit.

Materials List

← All Build Logs